Project Joseph at the Cathedral

Above, members of the Project Joseph team tend to St. Agnes Cemetery in late summer 2016.

Our Project Joseph team works on a wide variety of jobs throughout the county. They do maintenance and renovations at Catholic Charities properties, repair stones in cemeteries, remove snow at vacant properties and more. Last week, though, they were assigned a special, last minute task. Retired Syracuse Bishop James Moynihan had passed away, and the Cathedral of the Immaculate Conception needed to be in top shape for his funeral.

The challenge? The cathedral is undergoing extensive renovations. Last week they were in the midst of repainting the ceiling. There was scaffolding reaching up to the 50 foot vaulted ceilings and drop cloths across the floor. There was dust coating everything, and the Diocese was expecting a full house on Friday the 10th (including 100 priests and 8 bishops).

Between Monday the 6th and Thursday the 9th, seven Project Joseph team members assisted the painters in dismantling their scaffolding and then carrying planks, ramps and tarps out of the cathedral. They stayed on to dust the pillars and pews and mop the floor.  The job was mostly complete by Wednesday afternoon, leaving one day for fine tuning before the cathedral filled to honor Bishop Moynihan on Friday.

The Project Joseph team will continue to be part of the cathedral renovation, which started up again on Monday after the team carried back in the planks, tarps and ramps. They’re vital to Phase II of the construction, which includes pulling up the floor to install a new heating system. Most of the crew members who are part of this work are Nepalese refugees.

Project Joseph was proud to be part of preparing the cathedral for this special mass. The team looks forward to continuing to play a role in the renovation of the Diocese’s mother church.

Scroll to Top